The Process explains the following steps : This service can then be reached by SAP PI for signing the documents. A web service for signing the messages need to be deployed at a Net Weaver java server. The authorities require that all request messages like authorization, cancellation, and skipping requests are digitally signed. We have to maintain the adapter configuration like SOAP/HTTP/XI which are required for end to end communication between SAP, Authorities and business partners. ID configuration is required to create configuration scenarios based on integration scenarios from ESR. Note : The ESR content will be SAP standard so there is no need to develop integration objects in ESR. SAP Standard software component SLL-NFE 10.0 import is required in SAP Net weaver PI. This is required to maintain details of the business systems/technical systems which will be involved in the process. The SLD is mandatory for using SAP Nota Fiscal Electronica content in SAP Net Weaver PI. Status code information is also stored in the core application. RFC connections need to be setup in SM59 so that the three systems can communicate with each other for data communication.īusiness partners that will be taking part in the electronic exchange of NFE need to be setup in the core application.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |